The SAP EPC (Energy Performance Certificate) is produced at the as-built stage of a building project as the final part of the as-built SAP Calculations output.
Without an EPC, Building Control will not be able to sign a dwelling off, making them an extremely important part of the building process.
In order to produce as-built SAP calcs we need to know the following, so that we can be satified that we have the most accurate specification for the building to be able to then lodge the EPC.
The list of elements we need to process the as-built calculations & EPC are: